ALVARADO, UNION CITY, Calif. — Union City has advanced a public works proposal to repair the Dry Creek Bridge wingwall at Alvarado-Niles Road, including work around a sidewalk and paved trail. The city’s published bid notice outlines the job but does not independently confirm that construction is now underway.
What the repair proposal covers
The City of Union City bid listing describes removal and replacement of a damaged wingwall, footing and barrier. Planned work also includes excavation, temporary shoring, water pollution controls, reconstruction of portions of the sidewalk and paved trail, and replacement of wooden rails and posts.
The city listed an estimated construction cost of $100,000. It opened the solicitation on July 29, 2026, and closed bidding on August 17. A bid estimate is not the final contract price, and a closed solicitation does not prove that a contractor has completed the project.
Why residents should pay attention
The bridge is part of an important roadway corridor for Union City neighborhoods and businesses. If repairs require temporary pedestrian, bicycle or vehicle restrictions, those impacts should be announced through appropriate city construction channels. Residents should not assume that the bridge is closed merely because engineering documents describe work.
For current project status, access and any actual closures, check the Public Works Construction Advisory page or contact Union City Public Works. Signs at the bridge take precedence over older posted project plans.
Source: Union City Request for Bids 24-11, Dry Creek Bridge Wingwall Repair Project.
Support Alvarado News
Choose how to support Alvarado News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Alvarado News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Alvarado News
- Union City Library Plans Native American Heritage Crafts November 14 and Announces November Holiday Closures →
- Old Alvarado Park Plaza Was Site of April 2026 Civic Dedication; Historic Smith Street Remains a Community Landmark →
- Alvarado-Niles Water Pipeline Upgrade Targets Earthquake Reliability Along Smith Street and Union City Roads →
- Smith Street Gas Main Replacement Could Affect Westbound Traffic in Historic Alvarado Through Early November →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.