ALVARADO, UNION CITY, Calif. — People traveling through the historic Alvarado neighborhood should plan for possible construction restrictions on Smith Street. The City of Union City announced a PG&E gas main replacement project beginning October 5, 2026, with work expected to continue through early November.
Where the work is planned
The city's October 1 advisory identifies a westbound Smith Street restriction west of Tidewater Drive. Work includes gas pipeline replacement, followed by restoration involving concrete, driveways, pavement, repaving and striping. The stated weekday construction window is 9 a.m. to 3 p.m., Monday through Friday.
Residents and businesses may notice temporary lane closures, parking restrictions, noise and detours. City guidance says access to properties will be maintained whenever feasible, which does not mean access will be uninterrupted at every moment.
Check the latest traffic signs
The city's early-November estimate is a schedule, not verified proof that all work is currently active or finished. Conditions may differ by block and day. Drivers should follow temporary signs and directions from traffic control personnel, particularly when approaching businesses and neighborhood intersections.
Residents with questions can consult the Union City Public Works Construction Advisory page for updates. Gas leaks or an immediate safety threat should be reported using appropriate emergency utility contacts, not treated as an ordinary pavement complaint.
This is separate from Alameda County Water District's ongoing water pipeline seismic improvement project, even though both affect parts of the Alvarado area.
Support Alvarado News
Choose how to support Alvarado News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Alvarado News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Alvarado News
- Union City Library Plans Native American Heritage Crafts November 14 and Announces November Holiday Closures →
- Old Alvarado Park Plaza Was Site of April 2026 Civic Dedication; Historic Smith Street Remains a Community Landmark →
- Union City Bid Documents Detail Planned Dry Creek Bridge Wingwall Repairs on Alvarado-Niles Road →
- Alvarado-Niles Water Pipeline Upgrade Targets Earthquake Reliability Along Smith Street and Union City Roads →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.